Operators are protected from loads by retaining post system and from falling by the handrail.
System deployed by one person and in less than 5 minutes.
This system removes the need for fall arrest systems which can be expensive and time consuming.
No extra cranes or plant needed on site, saving time and money.
Forklifts can be used to load/unload when handrail swings downwards flush with the trailers sides.
EPS system deployment in progress.
Cementations own slings being reeved into cages.
Cages being craned off using cementations slings.
Cage offload continuing.